Rocky Flats 771/774 Building
D&D of 771/774 Complex – Plutonium Production Facility Building, formerly known as “The Most Dangerous Building in the Free World”
- Decontaminate and strip out of process support systems, safety systems, utilities, equipment, piping, electrical systems, interior partitions, CMU walls, and
|
Buffalo Memorial Auditorium
- Contracted to safely demolish the 150,000 square foot, 98 foot high municipal arena.
- Removed 16,000 seats, and performed the architectural salvage of the north facade, including match marking and crating, as mementos for the City of Buffalo.
- Utilized asbestos abatement
|
D&D of 779 Cluster Plutonium Storage & Process
- DEMCO successfully performed decontamination operations and safely demolished the 50,000 square foot, 2-story plutonium production building, along with its various smaller support buildings. DEMCO sorted, segregated, sized and transported, on-site, over 200 ton of RAD contaminated debris
|
General Mills Rooftop Conveyor Dismantlement
- Removal of rooftop conveyor system from the top of 160’ high operational grain processing facility, utilizing three 250-ton hydraulic cranes.
- Dismantlement of rooftop 4-story Lofton Leg Building.
- Dismantlement of Conveyor Building which hung over truck loading
|
|
|
|
 |
|
|
|