- Project oversight and skilled labor support for the reactor demolition at the Buffalo Medical Research Center, which was located at the center of an operational university.
- Demolished and removed over 9,500 tons of debris from site.
- Demolished, packaged and shipped over 1,000 ton of Low-Level Rad Waste (LLRW).
- Excavated and transported over 5,000 cubic yards of surrounding soil.
- Performed engineering and shoring services to ensure safe and legal excavation of 18 foot basement.
- Supported radiological survey team throughout project.
- Project was safely and efficiently completed without any interruption to the university, including the adjacent, occupied buildings.
|
|
|
|
|
|
|